Last updated: October 2, 2026  |  Reviewed by: Emil Amante, Rubber Decker

Short answer: Rubber Decker’s 2026 working rate for a straightforward flat poured-rubber surface is approximately $14 per square foot. The final price can change based on the condition of the existing surface, preparation and repairs, vertical surfaces or steps, colour blend, thickness, design, access and project location. Every project receives a site-specific quotation.

This guide explains what affects the price, what is normally considered during an estimate and how Ontario property owners can compare quotes fairly. The $14 figure is a planning reference, not a guaranteed quote. Rubber Decker quotations are normally valid for 14 calendar days unless stated otherwise because labour, material and freight costs can change.

Quick cost examples for flat surfaces

The examples below use the $14-per-square-foot working rate before taxes and before project-specific preparation, repairs, travel, custom work or other required services.

Approximate area Planning calculation Estimated flat-surface amount
200 sq. ft. 200 × $14 $2,800
400 sq. ft. 400 × $14 $5,600
600 sq. ft. 600 × $14 $8,400
800 sq. ft. 800 × $14 $11,200
1,000 sq. ft. 1,000 × $14 $14,000

These examples are for early budgeting only. They are not offers or final quotations. HST and any project-specific work are additional unless a written quotation states otherwise.

What affects the final cost?

1. Size and shape of the area

Square footage is the starting point, but a simple open patio is different from a pool deck with curves, drains, narrow sections and several edges. Detailed layouts require more cutting, mixing and hand-trowelling.

2. Condition of the existing surface

Poured rubber can often be installed over structurally sound concrete, asphalt, pool decks, patios, walkways, stairs and some other prepared bases. Loose material, contamination, large cracks, heaving or drainage problems may need attention before installation. Covering an unstable base does not correct the movement underneath it.

3. Cleaning and preparation

The surface must be suitable for the binder to perform properly. Depending on the site, preparation may include washing, removing loose coatings or debris, repairing problem areas and addressing edges. Rubber Decker’s 2026 working rate for power washing is $1 per square foot, with a $700 minimum, when that service is required and included in the quotation.

4. Steps, risers and vertical surfaces

Vertical work is more labour-intensive than a flat surface. Rubber Decker’s 2026 working rate for vertical surfaces and risers is approximately $25 per square foot. The actual quantity and detailing are confirmed during quoting.

5. Rubber type, colour and design

Material selection affects both appearance and price. Standard blends are generally more economical than custom colour mixtures, borders, logos or detailed patterns. Rubber Decker works with premium EPDM and TPV wear-layer materials, and the right option depends on the application, desired colour and budget.

6. Thickness and application

Residential resurfacing is commonly installed at a different thickness than an engineered playground system. Playground thickness depends on the project design and required fall-height performance, so it should not be priced as if it were an ordinary patio or pool deck.

7. Access, location and scheduling

Material movement, parking, gated access, stairs, distance from the mixing area and travel outside the regular service area can affect labour and logistics. Weather also matters because poured-rubber installation and curing require appropriate conditions.

What is usually included in a poured-rubber quote?

A professional quotation should clearly identify the measured area, proposed system, colour or blend, preparation included, edges or vertical surfaces, price, taxes, payment terms, expected scheduling and warranty terms. If something is uncertain—such as hidden damage beneath an old coating—it should be discussed before work begins.

Can poured rubber save the cost of removing concrete?

Sometimes. If existing concrete is stable and suitable, poured rubber can often be installed over it, avoiding full demolition and replacement. This can reduce disruption and disposal compared with removing the slab. However, badly heaved, moving or structurally unsound concrete may still require repair or replacement. Rubber Decker inspects the base before recommending an installation approach.

Is the lowest quote the best value?

Not necessarily. Compare the material system, thickness, surface preparation, edge details, warranty and installer experience—not only the price per square foot. A low figure may exclude preparation, vertical work or important site conditions. Ask each contractor to explain exactly what is included.

How long can poured rubber last?

With proper installation and maintenance, premium poured-in-place rubber may last well over 10 years. Actual service life depends on traffic, sun exposure, drainage, maintenance, the underlying base and material quality. Some worn surfaces can be refreshed or repaired without replacing the entire system.

How to get an accurate Rubber Decker estimate

  1. Send the project address and clear photographs of the entire surface.
  2. Provide approximate dimensions or square footage if available.
  3. Identify cracks, loose coatings, drainage issues, stairs and vertical faces.
  4. Share the intended use, preferred colours and any border or design ideas.
  5. Rubber Decker can review budget fit and arrange a site visit when required.

Frequently asked cost questions

Does every project cost $14 per square foot?

No. Approximately $14 per square foot is Rubber Decker’s 2026 working rate for straightforward flat-surface planning. Preparation, repairs, vertical work, thickness, colour, access, location and custom design can change the final quotation.

Are steps priced the same as a flat patio?

No. Steps and risers require more detailed hand work. Rubber Decker’s 2026 working rate for vertical surfaces and risers is approximately $25 per square foot.

Is removing the old concrete included?

Usually not, and removal may not be necessary. If the concrete is structurally sound, rubber can often be installed over it after the required preparation. The base must be inspected before that decision is made.

Does colour affect the price?

It can. Standard blends, premium colours, TPV or EPDM selections, borders and custom designs can have different material and labour requirements.

How long is a quote valid?

Rubber Decker quotations are normally valid for 14 calendar days unless the written quotation states otherwise. This allows for changes in material, freight and labour costs.

Plan your Ontario rubber-surfacing project

Rubber Decker installs poured-rubber surfaces for pool decks, patios, porches, walkways, driveways, playgrounds, daycares, home gyms and commercial spaces across Ontario.

Request a project-specific quote or explore our rubber-surfacing FAQs, pool-deck resurfacing, driveway and patio resurfacing, playground and daycare surfacing, and rubber-surface design tool.

About this guide: Rubber Decker prepared this information from its Ontario quoting and installation experience. Pricing and site conditions change, so the written quotation for a specific project always takes precedence over this guide.

Go to Top